pcc5

Happy New Year 2026

Introduction

About PCC5 – Power Engineering Consulting and Construction Joint Stock Company No. 5

Power Engineering Consulting and Construction Joint Stock Company No. 5 (PCC5) was established on July 25, 2005, by a team of experienced managers, engineers, and skilled workers with extensive expertise in electrical system construction in Vietnam.

Thanks to the company’s strong growth momentum and highly capable staff, PCC5 has earned the trust of domestic and international partners, being entrusted with the execution of many key projects, including:

  • 500kV O Mon 2 Substation

  • 220kV High-Tech Park Substation

  • Dung Quat Refinery Project (TECHNIP)

  • Nghi Son Refinery Project (JGCS)

  • Phong Dien 1 Wind Power Plant (REVN)

  • 220kV GIS Substations at Binh Tan and Hiep Binh Phuoc

  • VINA KRAFT Paper Mill (MARUBENI)

  • Dai Ninh Power Plant (TOSHIBA)

  • Long Thanh 1 Solar Power Plant (50 MWp)

  • Krong Pa Solar Power Plant (63 MWp)

  • 220kV Underground Cable Line: South Saigon – District 8

  • 110kV Underground Cable: Noi Bai Airport

  • And many other 220kV and 110kV substation projects across the country.

Readmore

Field

Areas of Operation

PCC5 provides comprehensive services to clients, delivering the best possible value and benefits.

Construction and Installation of Power Transmission Line Projects up to 500kV Construction and Installation of Power Transmission Line Projects up to 500kV

Construction and Installation of Power Transmission Line Projects up to 500kV

Power Engineering Consulting and Construction Joint Stock Company No. 5 (PCC5) specializes in the construction and installation of power transmission lines up to 500kV, offering comprehensive services that include: - Construction and installation of transmission lines - Supply of electrical cables - Supply of transmission poles - Supply of electrical accessories for transmission line installation

Details
Construction and complete installation of electrical systems and substations up to 500kV. Construction and complete installation of electrical systems and substations up to 500kV.

Construction and complete installation of electrical systems and substations up to 500kV.

We specialize in the design, construction, installation, and operation of power infrastructure projects up to 500kV, including transmission lines, substations, control–protection–measurement systems, and integrated technical infrastructure. With a team of experienced electrical engineers and a fleet of modern construction equipment, we ensure all projects meet the highest standards of safety, quality, schedule, and long-term operational efficiency.

Details
Testing and calibration of electrical equipment and accessories in power construction projects Testing and calibration of electrical equipment and accessories in power construction projects

Testing and calibration of electrical equipment and accessories in power construction projects

We provide testing, calibration, and inspection services for electrical equipment and accessories used in civil, industrial, energy, and infrastructure projects. With a team of highly trained engineers and state-of-the-art testing equipment, we ensure that every component meets the highest standards of safety, technical compliance, and reliability—ready for stable and efficient operation.

Details
Commerce and Services Commerce and Services

Commerce and Services

We operate comprehensively in the fields of commerce, technical services, and electrical construction, providing end-to-end solutions from consulting – design – material supply – installation – commissioning – maintenance for energy, industrial, infrastructure, and civil projects. With strong technical capabilities and a trusted partner network, we deliver turnkey solutions that optimize cost and ensure the highest operational efficiency for our clients.

Details
Construction of Solar Power Plants Construction of Solar Power Plants

Construction of Solar Power Plants

A solar power plant is a renewable energy facility that uses sunlight to generate electricity—typically through photovoltaic (PV) technology, and in some cases through concentrated solar power (CSP) systems. The electricity produced is either fed into the national power grid or supplied directly to local loads.

Details
Implementation of 110kV Underground Power Line Construction Implementation of 110kV Underground Power Line Construction

Implementation of 110kV Underground Power Line Construction

We possess the technical expertise and experience in constructing, installing, upgrading, and undergrounding 110kV power transmission systems, contributing to the modernization of electrical infrastructure, enhancing urban aesthetics, and ensuring the safe operation of the power grid.

Details
Construction of Wind Turbine Foundations and Wind Farms Construction of Wind Turbine Foundations and Wind Farms

Construction of Wind Turbine Foundations and Wind Farms

We specialize in the construction of foundations and infrastructure for wind farm projects, including wind turbine foundations, internal access roads, underground cable systems, substations, and grid connection infrastructure. With strong technical capabilities, modern equipment, and a team of experienced engineers and skilled workers, we are committed to delivering safe, precise, durable, and on-schedule construction solutions for wind energy projects both domestically and internationally.

Details

Projects

Projects

With over 20 years of growth alongside Vietnam’s power infrastructure, PCC5 is honored to have participated in numerous key projects, including nationally significant and strategic developments that contribute to the country's energy security and industrial progress.

News

News & Events

PCC5 CHÚC MỪNG NGÀY QUỐC TẾ PHỤ NỮ 8/3

Nhân ngày Quốc tế Phụ nữ 8/3, Ban chấp hành Công đoàn Công ty PCC5 tổ chức buổi họp mặt các chị em tại Văn phòng và Ban chỉ huy các công trường. Tại buổi họp mặt, các chị em cùng nhau trao đổi các tâm tư, nguyện vọng, chia sẽ những kinh nghiệm trong công việc của mình đóng góp những ý kiến cho hoạt động phong trao của hội Phụ nữ và hoạt động của tổ chức Công đoàn được tốt hơn.

22/12/2025

Energization and Completion of the 110kV Tầm Vu 2 Substation Project and Connection Line

On December 16, 2025, the 110kV Tầm Vu 2 Substation and its connection line were successfully energized and officially put into operation.

22/12/2025

Successful Energization of the Project Supplying Power from the National Grid to Côn Đảo Special Zone

At 4:05 AM on September 4, 2025, Vietnam Electricity (EVN) and the Power Project Management Board No. 3 (EVNPMB3) successfully energized the 110kV Côn Đảo Substation, marking a key milestone in delivering power from the national grid to Côn Đảo Special Zone. Earlier, at 7:09 PM on September 2, 2025, EVN and EVNPMB3 had also successfully energized the transmission project supplying electricity from the national grid to Côn Đảo, Ho Chi Minh City.

22/12/2025

Good News for Côn Đảo Special Zone

The project to supply electricity from the national grid to Côn Đảo Special Zone (Ho Chi Minh City), invested by Vietnam Electricity (EVN), spans a total length of 103.7 km and operates at a voltage level of 110 kV.

Read More